Platform code | 2900563 |
Platform name | APEX Profiling Float |
Description | Argo INDIA |
Ascending Profiling Time | 0 |
Calib Rt Coefficient | a1=1, a0=0.0004 |
Calib Rt Comment | Real-time salinity adjustment |
Calib Rt Date | 20120303000000 |
Calib Rt Equation | PSAL_ADJUSTED = a1 * PSAL + a0 |
Calib Rt Parameter | PSAL |
Cycle Time | 240 |
Data Centre | IN |
Deepest Pressure | 2000 |
Deploy Platform | aa siderenko |
Direction | A |
End Mission Date | 03/03/2012 12:40:11 |
End Mission Status | T |
Inst Reference | 2215 |
LABEL EN | CTD_PRES |
LABEL EN | CTD_TEMP |
LABEL EN | CTD_CNDC |
LABEL EN | FLOAT |
Launch Qc | 1 |
Parameter | TEMP |
Parameter | PSAL |
Parameter | PRES |
Parameter Accuracy | 0 |
Parameter Accuracy | 0 |
Parameter Accuracy | 0 |
Parameter Resolution | 0 |
Parameter Resolution | 0 |
Parameter Resolution | 0 |
Parameter Units | decibars |
Parameter Units | Siemens/meter |
Parameter Units | deg C |
Parking Pressure | 1000 |
Parking Time | 0 |
Pi Name | M Ravichandran |
Platform Maker | WRC |
Platform Model | APEX-SBE |
Positioning System | ARGOS |
Pr Experiment Id | Argo INDIA |
Pr Launch Datetime | 09/09/2005 00:00:00 |
Pr Launch Latitude | 0 |
Pr Launch Longitude | 57 |
Pr Probe Code | 846 |
Predeployment Calib Coefficient | ser# = 2329 pressure coeffs: PA0 = 0.388 PA1 = 0.137 PA2 = -3.25e-08 PTCA0 = -74.8 PTCA1 = 0.125 PTCA2 = 3.47e-05 PTCB0 = 25.1 PTCB1 = 0.000125 PTCB2 = 0 PTHA0 = -61.6 PTHA1 = 0.0524 PTHA2 = -8.11e-08 |
Predeployment Calib Coefficient | ser# = 2329 conductivity coeffs: G = -1.0200 H = 0.1450 I = -0.0001 J = 0.0000 CPCOR = -0.0000 CTCOR = 0.0000 WBOTC = -0.0000 |
Predeployment Calib Coefficient | ser# = 2329 temperature coeffs: A0 = 0.0000 A1 = 0.0003 A2 = -0.0000 A3 = 0.0000 |
Predeployment Calib Equation | Temperature ITS-90 = 1/ { a0 + a1[lambda nu (n)] + a2 [lambda nu^2 (n)] + a3 [lambda nu^3 (n)]} - 273.15 (deg C) |
Predeployment Calib Equation | y=thermistor output; t=PTHA0+PTHA1*y+PTHA2*y^2; x=pressure output-PTCA0+PTCA1*t+PTCA2*t^2; n=x*PTCB0/(PTCB0+PTCB1*t+PTCB2*t^2); pressure (psia)=PA0+PA1*n+PA2*n^2 |
Predeployment Calib Equation | f = inst freq * sqrt(1.0 + WBOTC * t) / 1000.0; t = temperature [deg C]; p = pressure [decibars]; delta = CTcor; epsilon = CPcor; Conductivity = (g + hf^2 + if^3 + jf^4)/(1+ delta t + epsilon p) Siemens/meter |
Project Name | Argo INDIA |
Ptt | 25451 |
Repetition Rate | 1 |
Sensor | CTD_TEMP |
Sensor | CTD_PRES |
Sensor | CTD_CNDC |
Sensor Accuracy | 0 |
Sensor Accuracy | 0 |
Sensor Accuracy | 0 |
Sensor Maker | SBE |
Sensor Maker | SBE |
Sensor Maker | SBE |
Sensor Model | SBE41 |
Sensor Model | DRUCK |
Sensor Model | SBE41 |
Sensor Resolution | 0 |
Sensor Resolution | 0 |
Sensor Resolution | 0 |
Sensor Serial No | 2329 |
Sensor Serial No | 2329 |
Sensor Serial No | 8040 |
Sensor Units | Siemens/meter |
Sensor Units | decibars |
Sensor Units | deg C |
Start Date | 16/09/2005 12:32:18 |
Start Date Qc | 1 |
Surface Time | 0 |
Trans Frequency | 401.65 x 10^6 |
Trans Repetition | 46 |
Trans System | ARGOS |
Trans System Id | 02602 |
Eulerian networks | MyOcean eulerian platforms |
Available data | From 27/08/2005 to 02/03/2012 |
Selected data | |
Filters | |
Download time series | To download data, please login here |
Download vertical profiles | To download data, please login here |
Physical parameters | No valid measure for this period |
Waterfall profiles |