Platform code2901031
Platform nameARVOR Profiling Float
DescriptionArgo JMA
Ascending Profiling Time6
Calib Rt Coefficienta1=1, a0=-0.0116
Calib Rt CommentReal-time salinity adjustment
Calib Rt Date20140225000000
Calib Rt EquationPSAL_ADJUSTED = a1 * PSAL + a0
Calib Rt ParameterPSAL
Cycle Time120
Data CentreJA
Deepest Pressure2000
Deploy Available Profile IdKS-3015
Deploy MissionKS11-07
Deploy PlatformKeifumaru
Descending Profiling Time12
DirectionA
End Mission Date25/02/2014 17:37:27
End Mission StatusT
Inst ReferenceOIN-10JAP-AR-26
LABEL EN19/06/2011 13:33:00
LABEL ENCTD_PRES
LABEL ENCTD_TEMP
LABEL ENCTD_CNDC
LABEL ENFLOAT
Launch Qc1
ParameterPRES
ParameterPSAL
ParameterTEMP
Parameter Accuracy0.002
Parameter Accuracy0.005
Parameter Accuracy2.4
Parameter Resolution0.001
Parameter Resolution0.001
Parameter Resolution0.1
Parameter Unitsdecibar
Parameter Unitsdegree_Celsius
Parameter Unitspsu
Parking Pressure1000
Parking Time90
Pi NameJMA
Platform MakerNKE
Platform ModelARVOR-SBE
Positioning SystemARGOS
Pr Experiment IdRoutine-JMA
Pr Launch Datetime19/06/2011 14:14:00
Pr Launch Latitude31.351
Pr Launch Longitude137.002
Pr Probe Code844
Predeployment Calib Coefficienta0=4.893897e-006 a1=2.748882e-004 a2=-2.556997e-006 a3=1.512231e-007
Predeployment Calib Coefficientg=-1.006717e+000 h=1.479456e-001 i=-4.019561e-004 j=5.145388e-005 CPcor=-9.5700e-008 CTcor=3.2500e-006 WBOTC=-4.7799e-007
Predeployment Calib CoefficientPA0=-1.369872e+000 PA1=1.386885e-001 PA2=1.754278e-008 PTHA0=-9.271432e+001 PTHA1=3.961878e-002 PTHA2=1.076225e-006 PTCA0=-7.152982e+001 PTCA1=-8.860880e-001 PTCA2=1.991242e-002 PTCB0=9.907527e+001 PTCB1=-1.008176e-002 PTCB2=0.000000e+000
Predeployment Calib Commentcalibrated at 2010/09/10
Predeployment Calib Commentcalibrated at 2010/09/10
Predeployment Calib Commentcalibrated at 2010/07/09
Predeployment Calib EquationTemperature[ITS-90](degC)=1/{a0+a1[ln(n)]+a2[ln^2(n)]+a3[ln^3(n)]}-273.15 where n=output
Predeployment Calib EquationPressure(psia)=PA0+PA1*n+PA2*n^2 where n=(output-PTCA0+PTCA1*t+PTCA2*t^2)*PTCB0/(PTCB0+PTCB1*t+PTCB2*t^2), t=PTHA0+PTHA1*y+PTHA2*y^2, y=thermistor_output
Predeployment Calib EquationConductivity(S/m)=(g+h*f^2+i*f^3+j*f^4)/(1+CTcor*t+CPcor*p) where f=output*sqrt(1.0+WBOTC*t)/1000, t=TEMP, p=PRES
Project NameRoutine-JMA
Ptt064216
Repetition Rate1
SensorCTD_TEMP
SensorCTD_CNDC
SensorCTD_PRES
Sensor Accuracy0.002
Sensor Accuracy2.4
Sensor Accuracy0.005
Sensor MakerSBE
Sensor MakerSBE
Sensor MakerKISTLER
Sensor ModelSBE41
Sensor ModelSBE41
Sensor ModelKISTLER
Sensor Resolution0.001
Sensor Resolution0.001
Sensor Resolution0.1
Sensor Serial No3300
Sensor Serial No2080534
Sensor Serial No3300
Sensor Unitsdbar
Sensor UnitsdegC
Sensor Unitspsu
Start Date19/06/2011 17:18:26
Start Date Qc1
Surface Time12
Trans Frequency401647000
Trans Repetition44
Trans SystemARGOS
Trans System Id03119
Eulerian networksMyOcean eulerian platforms
Available dataFrom 18/06/2011 to 24/02/2014
Selected data

From ... to ... Refresh

Filters

Download time seriesTo download data, please login here
Download vertical profilesTo download data, please login here
Physical parametersNo valid measure for this period
Waterfall profiles